Services delivered
- Examine the old drawings provided by the University.
- Hold discussion with the University with alternative proposals for protection works
- Hydraulic design to the main proposed diversion channels
- Proceed to prepare detailed designs and BOQ .
- Prepare Standard set of instruction, specification, conditions, payment schedule, etc. in a form of tender document.
- The total cost of the project is 42,890,415 Reyal Saudi