FLASH FLOODS & STORM WATER DRAINAGE PROJECTS · EGYPT
Storm Drainage Network For Mostakbal City
Al Mostakbal For Real State
- Client
- Al Mostakbal For Real State
- Location
- EGYPT
- Country
- Egypt
Scope of work
Overview
The scope of the study was to Evaluate the capacity of the compact network designed to drain wastewater in addition to the storm water network. Based on the results of the evaluation of the integrated network, appropriate solutions will be provided for storm water drainage within the future city, in the event that the sewage lines or the wastewater purification plant, or both, are unable to safely handle the amounts of rainwater coming into the network and the station.
Photography
Related projects