WATER AND WASTE WATER PROJECTS · OMAN
Water Storage & Distribution And Firefighting System
Public Establishment for Industrial Estates (Madayn)
- Client
- Public Establishment for Industrial Estates (Madayn)
- Location
- Sultanate of Oman
- Country
- Oman
Scope of work
Overview
Detailed Design of Development of Infrastructure at Thumrit industrial The main scope of works are divided into three main stages. The three stages Stage 1: Analysis of Existing Development, future plans in and around TIC. Stage 2 : Preparation of a Master Plan for TIC. Stage 3: Prepare the detailed design of all services and infrastructure.
Photography
Related projects