Services delivered
- Examine the old drawings provided by the University.
- Hold discussion with the University with alternative proposals for potable water network layouts.
- Hydraulic design to the main network elements using the commercial software Water Cad 8
- Proceed to prepare detailed designs and BOQ .
- Prepare Standard set of instruction, specification, conditions, payment schedule, etc. in a form of tender document.
- The total cost of the project is 9,883,822 Reyal Saudi